Shell loads first LNG vessel, using new LNG fuel infrastructure at Gate terminal
22 September 2016
Shell loads first LNG vessel, using new LNG fuel infrastructure at Gate terminal
The loading of Shell’s chartered LNG vessel, the Coral Methane, took place on 19 September 2016.