100th loading operation for LNG London
26 February 2021
The LNG bunker barge LNG London has safely loaded for the 100th time at Gate terminal’s small scale jetty in the Port of Rotterdam
LNG London has only been operational for around 1.5 year and this achievement is proving its competitiveness, flexibility and operational benefit in the growing LNG small-scale bunker market. Gate terminal is pleased to support our customers to further grow the LNG bunker market in the Port of Rotterdam. Having loaded 100 times without any safety issue we can only conclude that the LNG London and Gate terminal are performing at a high level.